Skip to content

Re-design of a diagnostic consumable

Our client asked:

The project story:

Results: deliverables and outcomes

Case study

March 15, 2025

Sheringham Shoal and Dudgeon Offshore Wind Farm Extensions

Case study

March 15, 2025

Programme MARSHALL extension

Case study

March 15, 2025

Portland Heliport ATZ

Case study

March 14, 2025

Radical cost reduction: for low-cost battlefield solutions

Case study

March 14, 2025

Recovery and Preservation in Dangerous Sampling (RAPIDS)

Case study

March 14, 2025

Introduction of Onward Routed Radar Data

Contact us to arrange a chat with our innovation experts